713-979-2333

Delayed Coking

CEC’s delayed coking expertise, including process design, simulation, engineering, and unit operations, results in safe, reliable, optimized unit designs.

An efficient delayed coking operation enhances a refinery’s ability to process heavier crudes into gas, light-to-medium range products, and petroleum coke, converting low-value residuum to high-value fuels while minimizing fuel oil production.  CEC ‘s experience includes: 

 

  • Automated coke drum head removal
  • Remote coke drum operations
  • Optimizing blow-down systems
  • Increasing the reliability of coke-handling systems
  • Coke drum replacement
  • Furnace optimization, re-tubing, and/or replacement
  • Switch deck redesign/optimization
  • Minimizing environmental impacts

Contact Us

Commonwealth Engineering and Construction
10255 Richmond, Suite 400
Houston, Texas 77042

Phone: 713-979-2333
Fax:     713-784-8984

Email Us

Sales This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Procurement This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Careers This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
All Other This e-mail address is being protected from spambots. You need JavaScript enabled to view it.